Manufacturing operations tool · Africa and India

Batch and Campaign Readiness Workbook

A practical evidence system for converting qualified demand into feasible campaigns, authorized batch starts, controlled shop-floor execution, timely disposition and disciplined close-out.

Current framework note

GMP controls the work; planning makes those controls executable.

Primary GMP baseline: WHO TRS 986 Annex 2 and EudraLex Volume 4 Chapters 4–6 connect controlled materials, production, documentation, testing and Quality disposition.

Operating system: ICH Q10 expects process-performance and product-quality monitoring, management responsibility, CAPA, change management and management review.

Risk decisions: ICH Q9(R1) supports proportionate risk control but does not permit schedule pressure to replace scientific evidence or authorized decisions.

Regional use: Apply the current national law, licence, registration, validation state and company procedures in India and each African jurisdiction; operational constraints change the plan, not the GMP standard.

Use the workbook correctly

A readiness and decision tool—not a production order or release authorization.

The workbook helps a cross-functional team expose missing evidence before a schedule is committed or a batch is started. Adapt its controls to the dosage form, facility, product risk, market, validated process, equipment train, material flow, testing strategy and approved quality system.

“Ready” requires current objective evidence. The tool does not issue materials, authorize a batch, approve a deviation, release a product or replace controlled master and batch records. “Not applicable” requires a reason.

Planning and execution logic

Four principles prevent a green schedule from hiding a red operation.

01

Demand is not yet a schedule

Forecasts, tenders, orders and funded commitments carry different confidence, inventory and working-capital consequences.

02

Capacity is finite and cross-functional

The true constraint may be a room, utility, operator, changeover, HPLC method, reviewer or released input—not the nominal line speed.

03

A batch starts through evidence

Materials, people, assets, utilities, documents, data systems and laboratory support must be ready at the actual decision time.

04

Release completes the operating promise

Compressed, filled or packed output is not customer-ready supply until the complete record supports authorized Quality disposition.

Eight controlled decisions

Make the evidence—not the calendar—authorize progression.

The gates connect commercial demand, operations and Quality. Each decision should identify the evidence reviewed, unresolved risk, conditions, owner and authority to proceed, hold or replan.

  1. G1

    Demand qualified

    Confirm that the requested product, market, pack, quantity, due date and commercial basis are real, authorized and legally executable.

  2. G2

    Schedule committed

    Approve a finite-capacity campaign and batch sequence that integrates materials, people, assets, cleaning, QC, Quality and release constraints.

  3. G3

    Inputs released

    Verify that the correct materials, components, artwork, specifications and laboratory inputs are available in an approved status.

  4. G4

    Start authorized

    Release the batch or line to start only after people, areas, equipment, utilities, documents and line-clearance evidence are ready.

  5. G5

    Process controlled

    Maintain the approved process, in-process controls, data, hold times, yields and event decisions while manufacturing is in progress.

  6. G6

    Pack reconciled

    Demonstrate correct pack identity, coding, inspection, component accountability, reconciliation and transfer to controlled finished-stock status.

  7. G7

    Disposition ready

    Bring the complete batch, packaging, laboratory, deviation, change and regulatory record to an authorized release or rejection decision.

  8. G8

    Campaign closed

    Reconcile the plan, materials, records, performance and open risks; restore the area and carry learning into the next planning cycle.

Interactive batch and campaign assessment

Commit the schedule only when the evidence can support it.

Define the campaign, assess each control, record the available evidence or next action, and use the gate view to expose what still prevents safe execution. Entries remain in this browser. “Ready” requires current, objective evidence—not an expected future action.

0%evidence ready
Assessed
0/64
Ready
0
In progress
0
Open gaps
0
Gate blockers unresolved
41
G1
Demand qualified0/3 ready
G2
Schedule committed0/11 ready
G3
Inputs released0/7 ready
G4
Start authorized0/12 ready
G5
Process controlled0/14 ready
G6
Pack reconciled0/5 ready
G7
Disposition ready0/5 ready
G8
Campaign closed0/7 ready

64 of 64 readiness controls shown

Framework reviewed 27 October 2026. Your context, notes and status remain only in this browser.

Control / gateReadiness controlOwner / applicabilityCriticalityMinimum evidencePrimary basisYour assessment
PLN-01Demand, planning and governanceG1 · Demand qualifiedDemand basis is classified and authorized

The requirement is identified as forecast, tender estimate, awarded contract, purchase order, replenishment, safety stock or another approved demand class; the planning confidence is visible.

Sales / Commercial / PlanningAll planned productsGate blockerApproved demand record showing source, confidence, quantity, due date and accountable commercial ownerICH Q10 management responsibility; planning governance
PLN-02Demand, planning and governanceG1 · Demand qualifiedProduct, market and pack are executable

The product, strength, dosage form, pack, artwork, manufacturing site and intended market are consistent with current licences, registrations and approved master data.

Regulatory / QA / PlanningRegistered or regulated productsGate blockerMarket-product-pack authorization check and current registration or licence referenceWHO GMP; national requirements; revised Schedule M
PLN-03Demand, planning and governanceG1 · Demand qualifiedNet requirement is calculated from usable supply

On-hand released stock, quarantine stock, work in process, open batches, committed demand, safety stock, expiry risk and likely release dates are reconciled without double counting.

Planning / Warehouse / FinanceAll supply plansMajorDated net-requirement calculation with inventory and open-order reconciliationPQS inventory and supply control
PLN-04Demand, planning and governanceG2 · Schedule committedBatch quantity and campaign logic are approved

Required output is converted into validated batch multiples and pack quantities using justified standard yield, reconciliation and overage assumptions.

Planning / Production / PackagingAll scheduled campaignsGate blockerApproved batch-and-pack calculation with campaign quantity and expected yieldEU GMP Chapter 5; validated process and master records
PLN-05Demand, planning and governanceG2 · Schedule committedFinite capacity and the governing constraint are confirmed

Available room, equipment, labour, utility, cleaning, packaging, QC and QA capacity is compared with required time; the true bottleneck and protected capacity are explicit.

Operations planning / Department headsAll committed schedulesGate blockerFinite-capacity load plan, constraint calculation and approved assumptionsICH Q10 process performance; operational control
PLN-06Demand, planning and governanceG2 · Schedule committedCross-functional dependencies are time-phased

Material release, dispensing, maintenance, calibration, cleaning, sampling, testing, batch review, release and dispatch dates support the proposed sequence.

Planning / Cross-functional teamAll committed schedulesGate blockerIntegrated schedule with owners, predecessor links and usable-ready datesWHO GMP main principles; EU GMP Chapters 1, 5 and 6
PLN-07Demand, planning and governanceG2 · Schedule committedFrozen horizon and schedule-change authority are defined

The near-term schedule has a controlled freeze point; additions, resequencing and cancellations require impact assessment and named approval rather than informal instruction.

Operations head / Planning / QARoutine and urgent schedulesMajorApproved production schedule, frozen horizon and change or escalation logICH Q10 management responsibility; change management
PLN-08Demand, planning and governanceG8 · Campaign closedPlan-versus-actual performance is reconciled

Every completed, delayed, cancelled or partially completed batch has a coded cause, impact, accountable action and learning input for the next cycle.

Planning / Operations / ManagementEvery campaign or review periodMajorCampaign close report with plan-versus-actual, loss reasons, actions and approved carry-overICH Q10 monitoring and management review
MAT-01Materials and warehouse readinessG2 · Schedule committedCurrent bill of materials and specifications are reconciled

API, excipients, processing aids, primary and secondary components and printed items match the approved formula, pack, market and effective master data.

Planning / Regulatory / QAEvery product and packGate blockerControlled BOM/specification reconciliation with effective version and marketWHO GMP documentation; EU GMP Chapters 4 and 5
MAT-02Materials and warehouse readinessG3 · Inputs releasedEvery source and manufacturer is approved

The actual manufacturer, grade, supplier, broker or repacker is approved for the material and market; deviations from approved sources are not hidden inside procurement urgency.

Procurement / Supplier quality / QAPurchased materials and componentsGate blockerApproved-vendor status, source traceability and quality-agreement referenceWHO GMP supplier controls; ICH Q10
MAT-03Materials and warehouse readinessG3 · Inputs releasedSufficient physical quantity is on site

Usable quantity covers dispensing, expected process loss, sampling, testing, retention and reconciliation; damaged, reserved or inaccessible stock is excluded.

Warehouse / PlanningEvery scheduled batchGate blockerLocation-level stock check, reservation and shortage calculationEU GMP Chapter 5; material control
MAT-04Materials and warehouse readinessG3 · Inputs releasedRelease, expiry, retest and FEFO status are acceptable

The planned use date and expected batch completion fall within the approved expiry or retest period; Quality status and any retest commitment are unambiguous.

Warehouse / QC / QAStarting and packaging materialsGate blockerMaterial status report with batch/lot, release, expiry or retest and FEFO reviewWHO GMP main principles; EU GMP Chapter 5
MAT-05Materials and warehouse readinessG3 · Inputs releasedStorage, segregation and environmental history are acceptable

Materials have remained in required conditions with controlled quarantine, released, rejected, returned and printed-component segregation; excursions are resolved before issue.

Warehouse / QACondition-sensitive and controlled materialsMajorWarehouse status/location check and reviewed environmental or excursion recordWHO good storage and GMP principles
MAT-06Materials and warehouse readinessG3 · Inputs releasedDispensing capacity and sequence are ready

Approved booths, balances, utensils, containers, labels, cleaning status, operators and staging space support the planned issue without mix-up or hold-time risk.

Warehouse / Production / QADispensed materialsGate blockerDispensing schedule and pre-use area/equipment readiness checkWHO GMP production controls; EU GMP Chapter 5
MAT-07Materials and warehouse readinessG4 · Start authorizedIssued materials are independently verified and traceable

Identity, lot, status, quantity, container count, label, destination batch and any partial-container control are checked and recorded before irreversible addition.

Warehouse / ProductionEvery batch and packGate blockerExecuted issue/dispensing record and batch-specific traceabilityEU GMP Chapter 5; good documentation practice
MAT-08Materials and warehouse readinessG8 · Campaign closedUnused, returned and excess materials are reconciled

Returns preserve identity and status; excess, damaged, rejected and obsolete materials and printed components are accounted for, investigated where necessary and dispositioned.

Warehouse / Production / Packaging / QAEvery completed campaignMajorApproved return/reconciliation record with discrepancy and destruction referencesWHO GMP; EU GMP Chapter 5
AST-01Facility, equipment and utilitiesG2 · Schedule committedAsset and room availability matches the sequence

Rooms and equipment are reserved for processing, cleaning, set-up, packaging and recovery time without overlapping products or hidden conflicts.

Production / Engineering / PlanningAll manufacturing and packagingGate blockerRoom/equipment loading plan including changeover and cleaning windowsEU GMP Chapters 3 and 5
AST-02Facility, equipment and utilitiesG2 · Schedule committedPreventive maintenance and calibration are protected

Due maintenance, calibration and statutory checks are integrated before schedule freeze; production urgency does not defer critical work without authorized risk assessment.

Engineering / Metrology / QACritical equipment and instrumentsMajorMaintenance/calibration due list reconciled to the campaign planWHO GMP equipment controls; ICH Q10
AST-03Facility, equipment and utilitiesG4 · Start authorizedQualification and intended-use status are current

Equipment, utilities, rooms and computerized functions are qualified or otherwise authorized for the intended product, batch size, operating range and data use.

Validation / Engineering / QAQualified systemsGate blockerCurrent qualification status and approved intended-use verificationWHO TRS 1019 Annex 3
AST-04Facility, equipment and utilitiesG4 · Start authorizedCleaning status and change parts are ready

Validated cleaning, clean hold time, equipment status, product-contact parts, screens, tooling, filters and pack-format change parts support the scheduled product and sequence.

Production / Packaging / QAShared areas and equipmentGate blockerPre-start cleaning/status check and verified change-part listEU GMP Chapter 5; cleaning validation
AST-05Facility, equipment and utilitiesG4 · Start authorizedUtilities and environmental conditions support the run

HVAC, power, water, gases, compressed air, temperature, humidity and environmental monitoring are within approved status and have sufficient capacity for concurrent operations.

Engineering / Production / QAUtilities relevant to the processGate blockerUtility release/capacity check and current environmental statusWHO GMP; WHO HVAC/water guidance
AST-06Facility, equipment and utilitiesG4 · Start authorizedAlarms, interlocks, recipes and data capture are controlled

Required alarms, safety interlocks, configured recipes, clocks, access, audit trails, backup and interfaces are operational before batch data are generated.

System owner / IT / Engineering / QAAutomated or electronic systemsGate blockerSystem pre-use verification, configured master-data check and open-alarm reviewWHO data integrity guideline; GMP computerized systems
AST-07Facility, equipment and utilitiesG4 · Start authorizedCritical spares and recovery arrangements are credible

Likely failure modes have available spares, tools, competent support, contact paths, backup power or safe-shutdown and restart instructions appropriate to local response times.

Engineering / EHS / OperationsCritical assets and utilitiesMajorCampaign contingency check and critical-spares/recovery listICH Q9(R1); business and quality risk management
AST-08Facility, equipment and utilitiesG8 · Campaign closedPost-campaign equipment and area condition is accepted

Cleaning, inspection, damage, outstanding maintenance, product residues, tooling, logbooks and status labels are resolved before release to the next use.

Production / Engineering / QAEvery campaign changeoverMajorApproved post-campaign area/equipment handover and open-work listEU GMP Chapter 5; equipment status control
DOC-01People, documents and dataG2 · Schedule committedShift staffing and supervision are feasible

The schedule includes sufficient authorized operators, supervisors, samplers, reviewers, maintenance and support roles for set-up, execution, breaks, cleaning and handover.

Production / HR / Department headsEvery campaign and shiftMajorRole-by-shift staffing plan with identified gaps and authorized coverageWHO GMP personnel; revised Schedule M
DOC-02People, documents and dataG4 · Start authorizedPersonnel are trained and task-qualified

Assigned people have current training and demonstrated competence for the product, equipment, critical step, sampling, IPC, cleaning, data system and abnormal-event response.

Department head / Training / QACritical GMP tasksGate blockerRole/task qualification matrix and current individual evidenceWHO GMP personnel; ICH Q10
DOC-03People, documents and dataG4 · Start authorizedCurrent master and batch documents are issued

Only approved, effective manufacturing and packaging instructions, specifications, sampling plans and processing parameters are available; obsolete copies are excluded.

Document control / Production / QAEvery batch and packGate blockerControlled issuance record with document/version reconciliationWHO GMP documentation; EU GMP Chapter 4
DOC-04People, documents and dataG4 · Start authorizedRequired SOPs, forms and logbooks are available

Cleaning, operation, IPC, sampling, line clearance, reconciliation, status, deviation, hold-time and equipment records are current and sufficient for the planned work.

Production / QA / Document controlEvery scheduled operationMajorPre-start document and blank-form readiness checkEU GMP Chapter 4; revised Schedule M
DOC-05People, documents and dataG4 · Start authorizedLabels, status controls and sample documentation are ready

Equipment, room, container, in-process material, sample and rejected-material status can be identified without handwriting around unavailable controlled labels or forms.

Production / QC / QAEvery batch and lineMajorControlled label/sample kit issue and countWHO GMP production and documentation controls
DOC-06People, documents and dataG5 · Process controlledRecords are attributable and contemporaneous

Entries are made by the person performing or observing the work at the time of activity; corrections, calculations, printouts, metadata and electronic records remain traceable.

All performers / Supervisors / QAPaper, electronic and hybrid recordsGate blockerExecuted records and raw-data review against ALCOA+ expectationsWHO TRS 1033 Annex 4
DOC-07People, documents and dataG5 · Process controlledShift handover preserves product and process status

The outgoing and incoming teams reconcile stage, quantities, elapsed hold time, equipment/area status, samples, open events, special instructions and next decision.

Shift supervisorsMulti-shift or interrupted processingMajorSigned shift-handover log linked to the batch and open-action listWHO GMP; data integrity and status control
DOC-08People, documents and dataG8 · Campaign closedThe complete executed record is assembled and secured

Batch, equipment, cleaning, environmental, sampling, laboratory, printout, reconciliation, event and electronic records are complete, legible, linked and transferred for review and retention.

Production / Packaging / QC / QAEvery completed batchGate blockerRecord-completeness checklist and controlled archive/review handoverWHO GMP documentation; EU GMP Chapter 4
PRD-01Manufacturing process controlG4 · Start authorizedArea clearance and formal start authorization are complete

Previous product, documents, materials, labels, waste and status have been cleared; room, equipment and environmental readiness are verified before issue or processing.

Production / QA as definedEvery batch start and changeoverGate blockerExecuted line/area clearance and authorized batch-start checkEU GMP Chapter 5; WHO GMP
PRD-02Manufacturing process controlG5 · Process controlledMaterial identity and additions are controlled

Each addition or transfer verifies material, lot, status, quantity, sequence, equipment and second-person or validated electronic check where required.

ProductionEvery processing stepGate blockerExecuted batch record with issue-to-addition traceabilityWHO GMP production controls
PRD-03Manufacturing process controlG5 · Process controlledCritical and key process parameters remain controlled

Set-points, approved ranges, endpoints, alarms and allowed adjustments are followed; actual values and interventions are recorded and assessed.

Production / Process ownerValidated processesGate blockerContemporaneous parameter record, trend or system data with exception reviewICH Q10; WHO validation guidance
PRD-04Manufacturing process controlG5 · Process controlledIn-process controls and sampling are timely

Defined IPCs, sample locations, quantities, frequencies, methods and acceptance criteria are performed without testing into compliance or processing beyond an unresolved limit.

Production / IPC / QCProcesses with IPCsGate blockerIPC and sampling records with result-to-decision timingEU GMP Chapter 5; approved control strategy
PRD-05Manufacturing process controlG5 · Process controlledHold times and time-dependent steps are protected

Start, stop, transfer, sampling, storage and restart times are visible; approved maximum holds, environmental conditions and extension rules are not exceeded.

Production / QAIntermediates, bulk and paused processesGate blockerTime-stamped batch chronology and hold-time checkWHO hold-time guidance; validated process
PRD-06Manufacturing process controlG5 · Process controlledYield, material balance and losses are assessed

Actual stage yield and reconciliation are compared with approved or expected ranges; unexplained loss, gain, spillage, dust, rejects and recovery are investigated promptly.

Production / QAEvery batch and critical stageMajorStage-yield and material-balance calculation with discrepancy assessmentEU GMP Chapter 5; batch records
PRD-07Manufacturing process controlG5 · Process controlledDeviations, alarms and interventions are contained

Unexpected events are recorded when observed, product and other batches are protected, evidence is preserved and continuation or restart is authorized by defined roles.

Production / Engineering / QAAny unexpected eventGate blockerEvent/deviation record with containment and documented continue/hold decisionICH Q9(R1); ICH Q10 CAPA system
PRD-08Manufacturing process controlG5 · Process controlledIn-process material identity and status remain unambiguous

Every container, trolley, vessel and area shows product, batch, stage, quantity where required, status and hold condition; transfers maintain segregation and traceability.

Production / Warehouse / QAWork in process and bulkMajorWIP status and transfer record reconciled to physical materialWHO GMP production controls
PAC-01Packaging and reconciliationG2 · Schedule committedPackaging capacity and pack sequence are feasible

Bulk availability, approved hold time, line format, change parts, speed, cleaning, component issue, QC checks and market priorities support the scheduled pack plan.

Packaging / PlanningFinished-product packagingGate blockerFinite packaging-line plan linked to bulk and release datesEU GMP Chapter 5
PAC-02Packaging and reconciliationG3 · Inputs releasedPrinted components and artwork are approved and available

Correct market, version, product, strength, pack size, language and legal text are confirmed; quantities allow set-up, process loss and full reconciliation.

Packaging / Regulatory / QAPrinted and market-specific componentsGate blockerArtwork/version check, component issue plan and controlled sampleWHO GMP packaging controls
PAC-03Packaging and reconciliationG4 · Start authorizedPackaging line clearance and set-up are authorized

Previous product and components are removed; line, printers, scanners, vision systems, balances and challenge samples are set for the correct batch and presentation.

Packaging / QA as definedEvery pack start and changeoverGate blockerExecuted line clearance, set-up and independent verificationEU GMP Chapter 5
PAC-04Packaging and reconciliationG6 · Pack reconciledCoding, online inspection and challenge tests remain effective

Batch number, manufacturing/expiry dates, price or market coding, barcode/serialization where applicable and rejection devices are verified at defined intervals.

Packaging / QACoded or inspected packsGate blockerCoding and challenge-test records with rejected-sample controlWHO GMP packaging; market requirements
PAC-05Packaging and reconciliationG6 · Pack reconciledPrinted-component and product reconciliation is acceptable

Issued, used, returned, destroyed, rejected, sampled and finished quantities reconcile within approved limits; discrepancies are investigated before line release.

Packaging / QAEvery packaging orderGate blockerComplete component/product reconciliation and discrepancy decisionEU GMP Chapter 5
PAC-06Packaging and reconciliationG6 · Pack reconciledRejects, returns and destruction are controlled

Online rejects, start-up waste, coded excess, damaged packs and returned printed components remain physically secured, counted, defaced or destroyed under approved control.

Packaging / Warehouse / QAPackaging components and rejected productMajorReject/return/destruction record with witness where requiredWHO GMP packaging controls
PAC-07Packaging and reconciliationG6 · Pack reconciledFinished packs and retention samples meet requirements

Pack appearance, identity, count, seal, leaflet, code, tamper evidence, shipper and samples meet the approved instruction and market presentation.

Packaging / QC / QAEvery finished-product batchGate blockerExecuted finished-pack checks and sample transfer recordApproved pack specification; EU GMP Chapter 5
PAC-08Packaging and reconciliationG6 · Pack reconciledPalletization, status and warehouse transfer are traceable

Shippers and pallets are identified by product, batch, quantity, market and status; transfer prevents mix-up and does not imply Quality release.

Packaging / WarehouseEvery packaged batchMajorFinished-stock transfer and pallet reconciliation under quarantine statusWHO GMP storage and status control
QLT-01Laboratory, Quality and dispositionG2 · Schedule committedSampling, testing and release capacity are scheduled

QC instruments, analysts, microbiology, outsourced testing, stability, sample queues and QA review capacity support the intended manufacturing and customer due dates.

QC / QA / PlanningAll committed batchesGate blockerLaboratory and batch-review load plan with turnaround assumptionsEU GMP Chapter 6; ICH Q10
QLT-02Laboratory, Quality and dispositionG3 · Inputs releasedLaboratory standards, reagents, instruments and methods are ready

Approved specifications and methods, qualified instruments, current columns/standards/reagents, environmental conditions and trained analysts are available before samples arrive.

QC managementRequired IPC, release and microbiological testingGate blockerMethod/instrument/standard readiness check and shortage listWHO GMP quality control; EU GMP Chapter 6
QLT-03Laboratory, Quality and dispositionG5 · Process controlledIPC and urgent result turnaround supports process decisions

Samples are identified, transported and tested within defined time; results reach authorized process personnel before the next dependent operation or hold-time limit.

QC / ProductionTime-critical testingMajorSample/result timing log linked to batch decision pointsApproved control strategy
QLT-04Laboratory, Quality and dispositionG7 · Disposition readyFinal samples, specifications and methods are reconciled

Representative release samples, reserve/retention samples and any market-specific tests are complete, traceable and tested against the correct effective specification.

QC / QAEvery batch proposed for dispositionGate blockerSample accountability and specification/method version checkWHO GMP QC; EU GMP Chapter 6
QLT-05Laboratory, Quality and dispositionG7 · Disposition readyRaw data, calculations and audit trails are reviewed

Complete paper and electronic raw data, metadata, calculations, integrations, sequences, invalid results and relevant audit trails support the reported result.

QC reviewer / QALaboratory data supporting dispositionGate blockerSecond-person and Quality review evidence with exceptions resolvedWHO TRS 1033 Annex 4
QLT-06Laboratory, Quality and dispositionG7 · Disposition readyManufacturing and packaging records are complete

All steps, checks, yields, reconciliation, labels, equipment and area records, samples, signatures and corrections are present and internally consistent.

Production / Packaging review / QAEvery completed batchGate blockerIndependent batch-document completeness and technical reviewWHO GMP documentation; EU GMP Chapter 4
QLT-07Laboratory, Quality and dispositionG7 · Disposition readyDeviations, OOS, changes and commitments are resolved

Every event and relevant change, validation, stability, regulatory or rework commitment is assessed for the batch and market before disposition.

QA / QC / Regulatory / ValidationEvery batch proposed for dispositionGate blockerBatch-specific quality-event and commitment reconciliationICH Q10; national requirements
QLT-08Laboratory, Quality and dispositionG7 · Disposition readyAuthorized disposition and system status agree

Only the authorized Quality unit releases, rejects or holds the batch; physical labels, warehouse status and ERP/LIMS status match the signed decision.

Authorized Quality person / WarehouseEvery finished-product batchGate blockerSigned disposition with synchronized physical and electronic statusWHO GMP main principles; revised Schedule M
PER-01Performance, recovery and close-outG2 · Schedule committedCampaign risk and contingency plan are approved

Material, power, utility, equipment, people, QC, cash, transport and regulatory risks have triggers, interim controls, owners and realistic response paths.

Operations / QA / Cross-functional teamPriority or constrained campaignsMajorCampaign risk register and contingency/action planICH Q9(R1)
PER-02Performance, recovery and close-outG5 · Process controlledPlan versus actual is visible at the required interval

Batch stage, output, downtime, hold time, sample/result status, release forecast and constraints are updated from reliable sources without pressuring teams to hide uncertainty.

Shift leaders / PlanningActive campaignsSupportingShift/daily control board with time-stamped actual statusICH Q10 performance monitoring
PER-03Performance, recovery and close-outG5 · Process controlledBreakdown, power and utility interruptions protect product

The response defines safe stop, containment, environmental impact, data continuity, elapsed hold time, restart checks and Quality escalation before production resumes.

Engineering / Production / QAAny critical interruptionGate blockerInterruption record with product-impact and authorized restart decisionICH Q9(R1); WHO GMP utilities and deviations
PER-04Performance, recovery and close-outG5 · Process controlledMaterial, staffing and laboratory constraints are escalated early

Shortages are raised before they create undocumented substitution, excessive hold, unsafe staffing, skipped maintenance or testing into compliance.

Planning / Department headsActive and near-term scheduleMajorConstraint log with trigger, owner, due time and decisionICH Q10 management responsibility
PER-05Performance, recovery and close-outG5 · Process controlledSchedule recovery is assessed and authorized

Overtime, resequencing, split campaigns, alternate equipment, expedited testing or deferred work is evaluated for GMP, validation, people, maintenance, cost and customer impact before implementation.

Operations head / QA / PlanningAny material schedule recoveryGate blockerApproved recovery plan and schedule-change impact assessmentICH Q9(R1); change management
PER-06Performance, recovery and close-outG8 · Campaign closedBalanced campaign performance is reconciled

Schedule adherence, right-first-time, yield, reconciliation, downtime, QC turnaround, release lead time, deviation load and OTIF are calculated from defined sources and interpreted together.

Operations excellence / ManagementEach campaign or reporting periodMajorApproved campaign scorecard with definitions, causes and actionsICH Q10 monitoring and management review
PER-07Performance, recovery and close-outG8 · Campaign closedRelease, supply and customer risks are handed over

Released and unreleased quantities, remaining tests, shelf life, dispatch dates, storage/transport needs, shortages and customer commitments have clear owners and escalation.

Planning / QA / Warehouse / CommercialEvery campaign closeMajorSupply handover and batch/release risk listICH Q10; GDP interface
PER-08Performance, recovery and close-outG8 · Campaign closedCampaign learning and open actions enter the next cycle

Repeat deviations, loss reasons, cleaning or changeover learning, asset issues, training needs, CAPA and improvement actions are retained with owners and effectiveness expectations.

Operations / QA / ManagementEvery campaign closeMajorCampaign close review, action log and next-plan inputICH Q10 CAPA, knowledge management and continual improvement

Decision rule: an unresolved gate blocker normally prevents progression. If an authorized exception is permitted by the pharmaceutical quality system, record the risk, interim control, decision authority, expiry and closure condition. “Not applicable” also requires justification.

Eight connected workstreams

One campaign record must connect every constraint and decision.

01PLN

Demand, planning and governance
Demand qualification, net requirements, batch sizing, finite-capacity scheduling, frozen horizons and authorized schedule change.

02MAT

Materials and warehouse readiness
BOM accuracy, approved sources, physical availability, release status, dispensing, traceability, returns and reconciliation.

03AST

Facility, equipment and utilities
Capacity, qualification, cleaning, maintenance, calibration, utilities, data systems, backup and post-campaign condition.

04DOC

People, documents and data
Staffing, competence, current instructions, controlled forms, contemporaneous records, shift handover and record completeness.

05PRD

Manufacturing process control
Line clearance, material additions, process parameters, IPCs, hold times, yields, events and in-process status.

06PAC

Packaging and reconciliation
Pack scheduling, printed components, line clearance, coding, inspection, reconciliation, samples and finished-stock transfer.

07QLT

Laboratory, Quality and disposition
Sampling and testing capacity, laboratory readiness, IPC support, raw-data review, batch review and authorized disposition.

08PER

Performance, recovery and close-out
Contingency, short-interval control, constraint escalation, controlled recovery, KPI reconciliation, supply handover and campaign learning.

Common planning and floor-control failures

Recognize the pattern before urgency normalizes the workaround.

Failure patternWhat it createsBetter control
Forecast, tender and purchase order are treated alikeCapacity and cash are committed to demand with very different probability.Classify demand and define what each class may reserve or trigger.
Material readiness means purchase order raisedSchedules begin before import, customs, sampling, testing and release uncertainty is resolved.Plan from the usable-ready date and keep every critical milestone visible.
Machine hours are treated as total capacityCleaning, set-up, maintenance, IPC waits, utilities, QC and review become invisible bottlenecks.Load end-to-end finite capacity and identify the governing constraint.
The schedule authorizes the batchTeams use informal workarounds because the date is already committed.Use formal evidence gates and explicit go, hold or replan authority.
Production completion is treated as supply completionQC and QA queues grow while delivery dates remain fictional.Plan sample, testing, review, investigation and disposition time.
Recovery means working fasterOvertime, resequencing or deferred maintenance transfers schedule pressure into quality risk.Assess recovery options across GMP, validation, people, assets, cost and supply.

Companion guide

Understand the operating decisions behind every workbook control.

The production-planning guide explains demand qualification, net requirements, finite capacity, campaigns, material usable-ready dates, batch start gates, shop-floor control, release, recovery and an Africa–India example.

Read the production-planning guide Return to the Operate hubReview transfer readiness

Primary framework references

Requirements and guidance reviewed to 27 October 2026.

Confirm current national law, authority interpretations, licence conditions, approved registrations, validated processes and product-specific requirements before implementation.

Educational notice: This workbook supports planning and readiness assessment. It is not a controlled production instruction, batch-start authorization, deviation decision, regulatory determination or batch-release document.